鋼制閘門主要用于給排水、水電、水利工程中,用以截止、疏通水流或調(diào)節(jié)水位。本廠綜合國內(nèi)外先進(jìn)結(jié)構(gòu)及工藝,對(duì)閘門已做了多次改進(jìn),形成批量生產(chǎn),多種規(guī)格出口遠(yuǎn)銷。 鋼制閘門特點(diǎn):
Steel
gates are mainly used in water supply and drainage, hydropower, and
hydraulic engineering to cut off, dredge water flow, or regulate water
levels. Our factory has made multiple improvements to the gate by
integrating advanced structures and processes both domestically and
internationally, forming mass production and exporting various
specifications for distant sales. Characteristics of steel gates:
1、結(jié)構(gòu)強(qiáng)、耐腐、耐磨、安裝方便。
1. Strong structure, corrosion resistance, wear resistance, and easy installation.
2、密封性能好,滲水量:正方向0.72(L/min.m)、反向(L/min.m)。 3.品種全、適應(yīng)性廣。
2.
Good sealing performance, water seepage rate: 0.72 (L/min. m) in the
positive direction and 0.72 (L/min. m) in the reverse direction. 3.
Complete variety and wide adaptability.
鋼制閘門安裝前的準(zhǔn)備: 1、
查看發(fā)貨清單,清點(diǎn)貨物數(shù)量及緊固件、備件等數(shù)量是否與清單一致,同時(shí)做好貨物的保管工作。未安裝前門體必須水平放置,防止門體變形而影響止水效果,同時(shí)絲桿以及聯(lián)接桿不可受力彎曲。
2、查看安裝資料(如安裝圖、合格證、使用說明書等)是否齊全。
3、對(duì)設(shè)備在運(yùn)輸過程中的變形及損壞要進(jìn)行全面的檢查和修復(fù)。4、檢查土建尺寸、預(yù)埋件及預(yù)留孔等是否符合要求。
5、安裝工作人員應(yīng)全部到場,并準(zhǔn)備好安裝時(shí)必需的設(shè)備(如:吊車、焊機(jī)、腳手架等)、安裝工具及測量工具等。
Preparation
before installation of steel gates: 1. Check the shipping list, count
the quantity of goods, fasteners, spare parts, etc., and ensure that
they are consistent with the list. At the same time, take good care of
the goods. If the front door body is not installed, it must be placed
horizontally to prevent deformation of the door body and affect the
sealing effect. At the same time, the screw rod and connecting rod
cannot be bent under force. 2. Check if the installation documents (such
as installation drawings, certificate of conformity, user manual, etc.)
are complete. 3. A comprehensive inspection and repair should be
conducted on the deformation and damage of the equipment during
transportation. 4. Check if the civil dimensions, embedded parts, and
reserved holes meet the requirements. 5. All installation personnel
should be present and prepare necessary equipment (such as cranes,
welding machines, scaffolding, etc.), installation tools, and
measurement tools for installation